Case Studies

AWS weighbridge scales remedial works

AWS weighbridge scales remedial works

Before and after shots show the difference.


Shoalhaven City Council Ulladulla Transfer Station

Design and Construct of Existing Public Weighbridge

DESCRIPTION OF THE WORK

The work consisted of the design and construction of a replacement & OFT Compliant weighbridge and pavement works for the Ulladulla Transfer Station. The site is an old capped landfill, and these days only operates as a recycling and waste transfer station facility. The existing weighbridge sits on timber piles. It is a two-way, above ground weighbridge with concrete ramps and approaches.

The scope of work under the Contract was for all works described, but is not limited to the following:

the design, including all necessary technical specifications, of a replacement semi-pit, two …